This Producing Process Sketch As Below Picture:
This Profile Drawing As Below Picture:
General Parameter
1 |
Item |
Parameters |
2 |
Model NO. |
YX705 |
3 |
Material |
Pre-painted galvanized sheet |
4 |
Thickness |
0.4-0.6 mm |
5 |
Yield Strength |
350 MPa |
6 |
Feed Width |
914 mm |
7 |
Effective width |
706 mm |
8 |
Roll Stages |
24 Stages |
9 |
Shafts Diameter |
∅75 mm |
10 |
Main Motor Power |
11 KW |
11 |
Hydraulic Group Power |
5.5 KW |
12 |
13Max Line speed of roll Former |
Approx. 12 m/min |
13 |
Electric Standard |
According to local voltage |
Machine Components
A. 5Ton*1250mm Hydraulic un-coiler with coil car
Hydraulic system expand coil inner hole, Pump motor: 3KW
Frequency Inverter to regulate turning speed, Motor: 3KW
Link-connect
expanding system
Load capacity = Max.5Tons
Coil Inner-diameter= 510±30 mm; Coil width = Max.1250mm
Automatic stopping device with limited switch as assistance to control stop/start rotation
B. Entry roller & Manual Pre-shearing device Un-powered
Smart cut control, to cut off the end of the final piece of sheet only
Working thickness up to 0.6mm
C. Cold Rolling Mills
Feeding section with guide
Gear/Sprocket driving;24-step to form;
Rollers manufactured from 45#, CNC lathes, hard Chrome Coated
Shafts Diameter=ф75mm, Precision Machined
Main Motor=11KW
Max Line speed of roll Former:Approx. 12 m/min
Protection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go Inside
D. Hydraulic Cutting Device
Stop to cut, Post cut, No Blanking cut
Cutting tool material : Cr12, Heat treatment;
Pump motor =5.5KW
E. PLC Control System
Control the quantity & cutting length automatically;
Combined with: PLC, Touch Screen, Inverter (SIEMENS), Encoder (Omron), REMOTE CONTROL etc
Cut-to-length tolerance≤±2 mm
Control Voltage 24V
F. Product Rack Un-powered, 3 units
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
1.Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
2.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.