This Producing Process Sketch As Below Picture:
This Profile Drawing As Below Picture:
General Parameter
1 |
Item |
Parameters |
2 |
Model NO. |
YXYX42.5-326.3-978.8 |
3 |
Material |
Pre-painted galvanized sheet |
4 |
Thickness |
0.42-0.60 mm |
5 |
Yield Strength |
350 MPa |
6 |
Feed Width |
1220 mm |
7 |
Effective width |
978.8mm |
8 |
Roll Stages |
27 Stages |
9 |
Shafts Diameter |
ф75/95 mm |
10 |
Main Motor Power |
7.5 KW |
11 |
Hydraulic Group Power |
5.5 KW |
12 |
Max. Line Speed Of Roll Former |
Approx.15 m/min |
13 |
Electric Standard |
According to local voltage |
Machine Components
A. 5 Ton X 1250 Hydraulic Un-coiler
Hydraulic system expand coil inner hole, Pump motor: 3KW
Frequency Inverter to regulate turning speed, Motor: 3KW
Link-connect expanding system
Load capacity = Max.5Tons
Coil Inner-diameter= 510±30 mm, Coil width = Max.1250mm
Automatic stopping device with limited switch as assistance to control stop/start rotation
B. Cold Rolling Mills
Feeding section with guide;
Feeding table make as folding type
Gear/Sprocket driving; 25 +2 stages to form
2 stages to form the bottom horizontal full ribs
Stands frame design with cassette type
Rollers manufactured from 45#, hard chrome coating
Shafts Diameter=ф75/95mm, Precision Machined
Main motor =15KW, Frequency speed control
Max line speed of roll former: Approx.15m/min
Protection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go Inside
C. Hydraulic Cutting Device
Stop to cut, Post cut, slug cutting;
Hydraulic group, Pump motor =7.5KW,
Cutting tool material: Cr12Mov, Heat treatment
Hydraulic group will be hide into the base fram to save the space
D. PLC Control System
Control the quantity & cutting length automatically;
Combined with: PLC, Touch Screen(SIEMENS), Inverter(Schneider),
Encoder (Omron), etc
Cut-to-length tolerance≤±2 mm
Control voltage 24V
Plc control panel will fix to the machine,below photos for reference.
E. Product Rack Un-powered, 6 units
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
1.Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
2.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.