This Producing Process Sketch As Below Picture:
This Profile Drawing As Below Picture:
General Parameter
1 |
Item |
Parameters |
2 |
Model NO. |
YX80-180/225 |
3 |
Material |
Pre-painted galvanized sheet |
4 |
Thickness |
0.4-0.7 mm |
5 |
Yield Strength |
245 MPa |
6 |
Feed Width |
1220 mm |
7 |
Effective width |
188/225 mm |
8 |
Roll Stages |
20 Stages |
9 |
Shafts Diameter |
ф75 mm |
10 |
Main Motor Power |
7.5 KW |
11 |
Hydraulic Group Power |
5.5 KW |
12 |
Max. Line Speed Of Roll Former |
Approx.15 m/min |
13 |
Electric Standard |
According to local voltage |
Machine Components
A. 3Ton X 600 Hydraulic Un-coiler
Hydraulic system for expansion coil-inner-hole with 4 palms
Link-connect expanding system
Pump power=1.5KW
Frequency Inverter to regulate turning speed: Motor: 4 KW
Load capacity=3 Ton;Coil Inner - diameter =451-530 mm
Coil outer-diameter=Max. 1500 mm
Coiler Width=Max. 600 mm
Driving motor to turn the coil
Automatic stopping device with limited switch as assistance to control stop/start rotation
B. Entry bench and manual pre-shearing device
Working thickness: up to 1.0 mm
Smart cut control, to cut off the end of the final piece of sheet only
C. Cold Rolling Mills
Feeding section with guide;
Gear/Sprocket driving; 20 stages to form
New-stand-frame-design
Rollers manufactured from 45#, hard chrome coating
Shafts Diameter=ф75mm, Precision Machined
Main motor =7.5KW
Max line speed of roll former: Approx.15m/min
Protection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go Inside
D. Hydraulic Cutting Device
Stop to cut, Post cut, slug cutting;
Hydraulic group, Pump motor =5.5KW,
Cutting tool material: Cr12Mov, Heat treatment
D. PLC Control System
Control the quantity & cutting length automatically;
Combined with: PLC, Touch Screen(SIEMENS), Inverter(Schneider),
Encoder (Omron), etc
Cut-to-length tolerance≤±2 mm
Control voltage 24V
E. Product Rack Un-powered, 6 units
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
1.Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
2.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.