• Upper Head Plate of Elevator Hall Door Roll Forming Machine
  • Upper Head Plate of Elevator Hall Door Roll Forming Machine
  • Upper Head Plate of Elevator Hall Door Roll Forming Machine
  • Upper Head Plate of Elevator Hall Door Roll Forming Machine
  • Upper Head Plate of Elevator Hall Door Roll Forming Machine
  • Upper Head Plate of Elevator Hall Door Roll Forming Machine

Upper Head Plate of Elevator Hall Door Roll Forming Machine

After-sales Service: 1 Year Warranty
Warranty: 1 Year Warranty
Transport Package: 40gp*1
Specification: 12T
Trademark: Xiamen Liming
Origin: Fujian, China(Mainland)
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Fujian, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Years of Export Experience
The export experience of the supplier is more than 10 years
to see all verified strength labels (27)

Basic Info.

Model NO.
UPPER HEAD PLATE OF ELEVATOR HALL DOOR ROLL FORMIN
Production Capacity
100 Set/Month

Product Description


This Profile Drawing As Below Picture:
Upper Head Plate of Elevator Hall Door Roll Forming Machine






 
General Parameter
1 Item Parameters
2 Model NO. Upper Head Plate of Elevator Hall Door Roll Fprming Machine
3 Material Galvanized Steel Sheet
4 Thickness 2.0 mm
5 Yield Strength 235 MPa
6 Feed Width  
7 Effective width  
8 Roll Stages 16 Stages
9 Shafts Diameter ф75 mm
10 Closed Loop Motor 7.5KW
11 Hydraulic Group Power 15 KW
12 Max. Line Speed Of Roll Former Approx.12m/min
13 Electric Standard According to local voltage

 
 
Machine Components

A.  3 Ton X 600 Hydraulic Un-coiler

Hydraulic system to expand coil inner hole;Pump motor:1.5KW;
Coil Inner-diameter= 451-530mm. Coil Outer-diameter Max. 1500mm;
Link-connect expanding system
Load Capacity: Max. 3Tons; Coil Width Max. 600mm;
Hydraulic Holder on the top to hold the sheet, keep press all the working time, special design on the hydraulic group

Upper Head Plate of Elevator Hall Door Roll Forming Machine

B.  Pre-Leveling Device
The In-feed Section of the machine allows for variations in sheet width
Pre-Level Device with 4 over 3 shafts to remove the Coil-set
Upper Head Plate of Elevator Hall Door Roll Forming Machine

C.  Hydraulic Pre- punching
Total two sets punching stations
Two sets molds for punching holes

D.Cold Rolling Mills
The feeding section with guide;
Gear/Sprocket driving, 16-step to form
Wall-plate-frame-design,H beam base,with leveling bolts in the base to adjust the level
Rollers manufactured from Cr12, Heat Treatment, precision machined.
Shaft Diameter=75mm, Precision Machined, heat Treatment
Main Motor=11KW by closed loop control
Forming speed approx. 0-12m/min
5-Shafts Leveling device

 
E.  Hydraulic post fly Cutting
Fly cutting, blanking cut
Blade material: Cr12Mov, heat treatment.
Hydraulic motor=15KW


F.   PLC Control System
Control the quantity, punching position & cutting Length automatically, and setting parameters for auto web/flank size changing
Cut-to-length for post-cut,
Combined with: PLC, Touch Screen (SIEMENS), Inverter (SCHNEIDER), Encoder (Omron), etc
Closed Loop control
Cut-to-length tolerance≤±2 mm
Control Voltage 24V

G.   Run-out Rack    6 meters, un-power
Full mesh cover above the roll former to avoid hands go inside, slit movable type

 
 
Upper Head Plate of Elevator Hall Door Roll Forming MachineUpper Head Plate of Elevator Hall Door Roll Forming Machine
 
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.

 
Terms Of Trade
1.Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
2.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now