• High Speed Double Layer Automatical Electric Stacker Roll Forming Machine
  • High Speed Double Layer Automatical Electric Stacker Roll Forming Machine
  • High Speed Double Layer Automatical Electric Stacker Roll Forming Machine
  • High Speed Double Layer Automatical Electric Stacker Roll Forming Machine
  • High Speed Double Layer Automatical Electric Stacker Roll Forming Machine
  • High Speed Double Layer Automatical Electric Stacker Roll Forming Machine

High Speed Double Layer Automatical Electric Stacker Roll Forming Machine

Tile Type: Colored Steel
Certification: CE, ISO
Condition: New
Customized: Customized
Usage: Roof, Wall
Transmission Method: Motor Drive
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2018

Suppliers with verified business licenses

Fujian, China
Importers and Exporters
The supplier has import and export rights
High Repeat Buyers Choice
More than 50% of buyers repeatedly choose the supplier
Cooperated with Fortune 500
This supplier has Cooperated with Fortune 500 companies
Years of Export Experience
The export experience of the supplier is more than 10 years
to see all verified strength labels (27)

Basic Info.

Model NO.
tacker roll forming machine
Delivery Terms
40-60 Days
Transport Package
40gp*1
Specification
3500KG
Trademark
LIMING MACHINERY
Origin
Fujian, China (Mainland)
Production Capacity
600

Product Description

Double  Automatical Electric Stacker Work With Roll Forming Machine

The chart of process flow:

High Speed Double Layer Automatical Electric Stacker Roll Forming Machine

1.Technical parameters

The main technical parameters are for your inference only.
Only if you provide the profile required or the real objects of sectional materials, and we will offer the accurate parameters.
Pneumatic stacker
Stacking Length Max. 12 meters
Pile up the sheet after cutting automatic
Equipped with a bottom pallet to be pull out by motor driven
Support arm action in vertical direction, driven by pneumatic system
Action controlled by Pneumatic system.
The air supply provided by the user
Automatic stopping device
To work with the roll former and keep the same operation direction
Combined Dimensions: 54.516CBM
Option:
  1. 6/8/10/18/ 24 meter or other meter stacker
Pl refer to the attached pictures for details
5. Service after sell
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
(1) If installation is needed, Liming (the seller) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
(2) If installation is needed, the buyer shall make the following preparation before arrival of technicians.
a) Position the machine in the buyer's factory.
b) Prepare necessary electric wiring.
c) Prepare material of trial running.
d) Provide labors for assistance and installation during installation.
e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly.
6. About us
Please visit the web site: liming2018.en.made-in-china.com for detailed information

Below pictures for your reference only

High Speed Double Layer Automatical Electric Stacker Roll Forming Machine
High Speed Double Layer Automatical Electric Stacker Roll Forming Machine
High Speed Double Layer Automatical Electric Stacker Roll Forming Machine
 


High Speed Double Layer Automatical Electric Stacker Roll Forming Machine

After-Sale Service

In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.

 

Terms Of Trade

Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.







 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now