• Taper Standing Seam Roll Forming Making Machine
  • Taper Standing Seam Roll Forming Making Machine
  • Taper Standing Seam Roll Forming Making Machine
  • Taper Standing Seam Roll Forming Making Machine
  • Taper Standing Seam Roll Forming Making Machine
  • Taper Standing Seam Roll Forming Making Machine

Taper Standing Seam Roll Forming Making Machine

After-sales Service: 1 Year Warranty
Warranty: 1 Year Warranty
Tile Type: Colored Steel
Certification: CE, ISO
Condition: New
Customized: Customized

Contact Supplier

Diamond Member Since 2018

Suppliers with verified business licenses

Manufacturer/Factory & Trading Company

Basic Info.

Model NO.
ROLL FORMING MACHINE
Usage
Floor
Transmission Method
Motor Drive
Thickness
0.4-0.6mm
Transport Package
1X40gp
Specification
8T
Trademark
LIMING MACHINERY
Origin
Xiamen
Production Capacity
600sets/Year

Product Description

1) The general machine parameter

Suitable roll forming material

Color steel sheet or Aluminum

Thickness

0.4mm-0.6mm

Feeding width

 

Frame design

Wall-plate-frame-design /New-stand-frame-design

Roll stages

18 stages

Material of forming roller

45# steel, CNC lathes, Hard Chrome Coated

Shafts Diameter

Φ75 mm

Main motor power

7.5KW with reducer

Max. Line speed of roll former 

Approx. 4m/min (stair length 350mm, production length 6m)

Electric Standard

380V /50Hz/3PH or as the customer's requirements

Machine Dimensions 

8560mm×1970mm×1610mm

Major Color of Machine Painted

RAL 5015 (Blue) or as per customer's requirements

(2)  PLC Control system  

PLC

Siemens brand (ABB brand is available if required)

Touch Screen

Siemens brand (ABB brand is available if required)

Inverter

Schneider brand (ABB brand is available if required)

Encoder

 Omron brand

(3) Product rack  

Description

un-powered, 3 units

(4) Options for tile roof :

A.Hydraulic pre-shearing device

B.Improvement for driving system for Tile roof

Servo motor instead of AC motor for the roll former, to increase the production speed and the tolerance between two stairs

Driving system with gear box and redirector for every three/four stages to improve the speed and tolerance control. Sprocket driving between each three/four stages.

(5) Service after sell

In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excluding the electric elements.

Installation:

(1) If installation is needed, Liming (the seller) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.

(2) If installation is needed, the buyer shall make the following preparation before arrival of technicians.

a) Position the machine in the buyer's factory.

b) Prepare necessary electric wiring.

c) Prepare material of trial running.

d) Provide labors for assistance and installation during installation.

e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly.

Taper Standing Seam Roll Forming Making Machine
Taper Standing Seam Roll Forming Making Machine
Taper Standing Seam Roll Forming Making Machine
Taper Standing Seam Roll Forming Making Machine

Taper Standing Seam Roll Forming Making Machine

After-Sale Service
 
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine
with charge free. The buyer should assist US to
get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.

Terms Of Trade
Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing
Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.

    Send your message to this supplier

    *From:
    *To:
    avatar Miss Esetlle
    *Message:

    Enter between 20 to 4,000 characters.

    This is not what you are looking for? Post a Sourcing Request Now