YX25-200-1000 COLD ROLLING MILLS FOR TILE ROOF PROFILE
Material: 0.4mm Minimum Thickness, 0.6mm Maximum Thickness
0.5mm thickness is for inspection, common use
Effective width: 1000±5mm
Feeding width: 1219mm
Pre-paint Coil, Yield Strength: 250-350MPa
Machine Components
a. 5 Ton*1250mm Hydraulic un-coiler
Hydraulic system expand coil inner hole, Pump motor: 3KW
Frequency Inverter to regulate turning speed, Motor: 3KW
Link-connect expanding system
Load capacity = Max.5Tons
Coil Inner-diameter= 510±30 mm, Coil width = Max.1250mm
Automatic stopping device with limited switch as assistance to control stop/star rotation
b. Entry roller & Manual Pre-shearing device Un-powered
Smart cut control, to cut off the end of the final piece of sheet only
Working thickness up to 0.8mm
Polythene Film-on Device
Un-powered film-on device to cover plastic film on the surface of sheet
c. Cold Rolling Mills
Feeding Section with guide;
Gear/Sprocket driving; 18-steps to form;
New-stand-frame-design
Rollers manufactured from 45#, CNC lathes, hard Chrome Coated
Shafts Diameter=ф75mm, Precision Machined
Main motor =7.5 KW, Frequency speed control
Forming speed: Approx. 4m/min (on the base of stair length 350mm / production length 6m)
Protection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go Inside, slip type
d.Hydraulic Stair-Drawing & Cutting M/C
Stop to press, Stop to cut; Post cut, No Blanking cut
Cutting tool material: Cr12Mov, Heat treatment
Stair depth=20mm
Pump motor =11 KW
The following pictures are for your reference only
e. PLC Control System
Control the quantity, drawing length (250-350mm) & cutting length (min.800mm) automatically.
Combined with: PLC, Touch Screen (Siemens), Inverter (Schneider), Encoder (Omron), etc
CLOSED LOOP CONTROL SYSTEM
Cut-to-length tolerance≤±2 mm
Control voltage 24V
Product Rack Un-powered, 3 units
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required
before the machine be send out of factory.