After-sales Service: | 1 Year Warranty |
---|---|
Warranty: | 1 Year Warranty |
Certification: | CE |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Description
(1) Pre-Leveling Device |
|
Description |
The In-feed Section of the machine allows for variations in sheet width Pre-Level Device with 4 over 3 shafts to remove the Coil-set |
(2)The general machine parameter |
|
Suitable roll forming material |
Pre-paint Coil, Galvanized coil |
Thickness |
1.5mm - 2.5mm |
Frame design |
Wall-plate-frame-design /Strong-stand-frame-design |
Roll stages |
15 stages |
Material of forming roller |
GCr15, CNC lathes, Hard Chrome Coated, Heat treatment |
Shafts Diameter |
Φ75mm |
Main motor power |
15KW , Frequency speed control |
Max. Line speed of roll former |
15m/min (Higher speed is available, depends on the specification required by the buyer) |
Hydraulic group power |
15 KW |
Material of cutting blade |
Cr12, heat treatment |
Electric Standard |
380V /50Hz/3PH or as the customer's requirements |
Machine Dimensions |
Machine 1: 8260mm×1370mm×1050mm+part Machine 2: 2000mm×900mm×1650mm |
Major Color of Machine Painted |
RAL 5015 (Blue) or as per customer's requirements |
(3) PLC Control system |
|
PLC |
Siemens brand (ABB brand is available if required) |
Touch Screen |
Siemens brand (ABB brand is available if required) |
Inverter |
Schneider brand (ABB brand is available if required) |
Encoder |
Omron brand |
(4)Product rack |
|
Description |
Un-powered, 6 meters length |
(5)Option: Cooling system for rollers CE certificate Pneumatic un-loading device Pl refer to the attached pictures for details |
|
(6) Service after sell |
|
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements. Installation: (1) If installation is needed, Liming (the seller) will dispatch technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist Liming to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation. (2) If installation is needed, the buyer shall make the following preparation before arrival of technicians. a) Position the machine in the buyer's factory. b) Prepare necessary electric wiring. c) Prepare material of trial running. d) Provide labors for assistance and installation during installation. e) If possible, One Chinese-speaking interpreter so that the communication between the buyer and seller's technician will go smoothly. |