YX50-334-1000 Cold Roll Forming Machine for Floor Decking
General Parameter
1 |
Item |
Parameters |
2 |
Model NO. |
YX50-334-1000 |
3 |
Material |
Pre-painted galvanized sheet |
4 |
Thickness |
0.8-1.2 mm |
5 |
Yield Strength |
350 MPa |
6 |
Feed Width |
1219 mm |
7 |
Effective width |
1000 mm |
8 |
Roll Stages |
26 Stages |
9 |
Shafts Diameter |
ф95 mm |
10 |
Main Motor Power |
18.5 KW |
11 |
Hydraulic Group Power |
7.5 KW |
12 |
Max. Line Speed Of Roll Former |
Approx.15 m/min |
13 |
Electric Standard |
According to local voltage |
Machine Components
A.6 Ton*1250mm Hydraulic un-coiler
Hydraulic system expand coil inner hole, Pump motor: 3KW
Frequency Inverter to regulate turning speed, Motor: 3KW
Link-connect expanding system
Load capacity = Max.6Tons
Coil Inner-diameter= 510±30mm, Coil width = Max.1250mm
Automatic stopping device with limited switch as assistance to control stop/star rotation
B.Entry Hydraulic Pre-shearing Device
Working thickness:up to 1.5mm
Smart cut control
C.Cold Rolling Mills
Feeding section with guide;
Gear/Sprocket driving;26 stages to form
Wall-plate-frame Design
Rollers manufactured from 45#, hard chrome coating
Shafts Diameter=ф75mm, Precision Machined
Main motor =18.5*2KW,Frequency speed control
Max line speed of roll former: Approx.15m/min
Protection mesh cover above the roll form to avoid the hands going it
C. Hydraulic Cutting Device
Stop to cut, Post cut, No Blanking cut
Cutting tool material : Cr12Mov, Heat treatment;
Pump motor =7.5KW
D. PLC Control System
Control the quantity & cutting length automatically;
Combined with: PLC, Touch Screen, Inverter (SIEMENS), Encoder (Omron), REMOTE CONTROL etc
Cut-to-length tolerance≤±2 mm
Control Voltage 24V
E. Product Rack Un-powered, 3 units
After-Sale Service
Installation:
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
1.Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
2.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.