Cold Roll Form Machine for Pre-Leveling /Slitting/Shearing Line
Machine Components
A. 5 Ton X 1250 Hydraulic Un-coiler
Hydraulic system expand coil inner hole, Pump motor: 3KW
Frequency Inverter to regulate turning speed, Motor: 3KW
Link-connect expanding system
Load capacity = Max.5Tons
Coil Inner-diameter= 510±30 mm mm, Coil width = Max.1250mm
Automatic stopping device with limited switch as assistance to control stop/star rotation
B. Pre-Leveling/Slitting/Shearing Line
Polythene Film-on Device
Un-powered film-on device to cover plastic film on the surface of sheet
Entry roller one set(Feeding section with guide)
Pre-Leveling Device one set(pre-Level Device with 4 over 3 shafts to remove the Coil-set)
Straightening splitter motor: 3KW, frequency conversion speed control
Total 4 sub - cutter, a maximum of 5 sub - cutter
Rollers manufactured from 45# steel, CNC lathes, hard Chrome Coated
Additonal two sets/set of splitter (note:the spare splitter needs to be mounted with a knife holder)
Minimum distance between two parting wheels on the same shaft: 70mm (minimum width of middle parting: 70mm)
The minimum parting distance of shaft end turning edge is 40mm
Electric cutting, motor power: 3KW
Width:Max.1250mm, thickness:0.4-1.0mm
Protection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go Inside, slip type
C. PLC Control System
Control the quantity & cutting length automatically;
Combined with: PLC, Touch Screen (Siemens), Inverter (Schneider), Encoder (Omron), etc
Cut-to-length tolerance≤±2 mm
Control Voltage 24V
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
1.Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
2.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.