After-sales Service: | 1 Year Warranty |
---|---|
Warranty: | 1 Year Warranty |
Tile Type: | Colored Steel |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
This is roof forming machine can use to produce many kinds of beautiful outlooking wall panels.
5Ton*1250mm Hydraulic un-coiler |
Hydraulic system expand coil inner hole; Pump motor:3kw; Frequency Inverter to regulate turning speed; Motor:7.5kw; Link-connect expending system,Load capacity = Max.5Tons; Coil inner-diameter= 510±30;Coil width = Max.1250mm Dance arm assistance for coil-turning stop/start control |
Entry Bench | Un-power |
Electric Pre-Shearing device For Flat sheet |
Stop to cut, motorized, pre-shear, motorized Working thickness: up to 0.8mm Smart cut control Note: The pictures as following are only for your reference |
Cold Rolling Mills |
Feeding section with guide; Gear/Sprocket driving; 16 step to form; Rollers manufactured from 45# steel, CNC lathes, hard Chrome Coated Shafts Diameter=75/95mm, Precision Machined Main motor =7.5 KW, Frequency speed control Max line forming speed: Approx. 35m/min; Protection Mesh Cover Above Roll-former To Avoid Hands Go Inside |
Hydraulic Cutting Device |
Stop to cut, Post cut, Slug Breaker Hydraulic pack, Pump motor =4KW Cutting tool material: Cr12, Heat treatment |
PLC Control System |
Control the quantity & cutting length automatically Combined with: PLC, Touch Screen (SIEMENS), Inverter (SCHNEIDER), Encoder (Omron), etc Cut-to-length tolerance≤±2 mm Control voltage 24V |
Product Rack | Un-powered, 3 units |
Pneumatic stacker | 6,8,10,12meter optional |
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.