Galvanized Roof Wall Floor Decking Cassette Roll Forming Machine
Advantages
Chuck quick-change design, common discharge machine, feeding device, etc., the price is much lower than two sets of the same version of the host, to support the customization of more than two different versions, a machine multi-purpose, saving time and energy and space.

Product Description


Product Parameters
This Profile Drawing As Below Picture:
profile1:
Material: 0.7mm Minimum Thickness, 1.5mm Maximum Thickness
0.9mm is for inspection, 1.5mm Maximum Thickness
Galvanized Coil, Yield Strength:550Mpa
profile2:
Material: 0.7mm Minimum Thickness, 1.5mm Maximum Thickness
1.0mm is for inspection, 1.5mm Maximum Thickness
Galvanized Coil, Yield Strength:435Mpa,550Mpa
General Parameter
1 |
Item |
Parameters |
2 |
Model NO. |
Cold Rolling Mislls for Deck (CASSETTE CHANGING) |
3 |
Material |
Galvanized sheet |
4 |
Thickness |
0.7-1.5 mm |
5 |
Yield Strength |
345Mpa,550Mpa |
6 |
Feed Width |
870/1000 mm |
7 |
Effective width |
600/627 mm |
8 |
Roll Stages |
38 Stages |
9 |
Shafts Diameter |
ф95 mm |
10 |
Main Motor Power |
11 KW |
11 |
Hydraulic Group Power |
4 KW |
12 |
Max. Line Speed Of Roll Former |
Approx.15 m/min |
13 |
Electric Standard |
According to local voltage |
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
1.Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
2.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.