This Profile Drawing As Below Picture:
General Parameter
1 |
Item |
Parameters |
2 |
Model NO. |
YX28-260-1040 |
3 |
Material |
pre-paint galvanized sheet |
4 |
Thickness |
0.35-0.8 mm |
5 |
Yield Strength |
350 MPa |
6 |
Feed Width |
1219 mm |
7 |
Effective width |
1040 mm |
8 |
Roll Stages |
20 Stages |
9 |
Shafts Diameter |
ф75/95 mm |
10 |
Main Motor Power |
7.5 KW |
11 |
Hydraulic Group Power |
4 KW |
12 |
Max. Line Speed Of Roll Former |
Approx.15 m/min |
13 |
Electric Standard |
According to local voltage |
Machine Components
A. 5Ton*600mm manual un-coiler
un-powered; Load capacity= MAX.5Ton
Coil inner-diameter=508mm
Coil Width= MAX.1250mm
B. Entry bench and Manual pre-shearing device
Un-powered Smart cut control, to cut off the end of the final piece of sheet only
Working thickness: up to 0.8mm
C. Cold Rolling Mills
Feeding section with guide;
Gear/Sprocket driving;20 stages to form
New-stand-frame-design
Rollers manufactured from 45# steel, hard chrome coating
NTN ball bearing at both ends of shaft in each forming stage
Shafts Diameter=ф75/95mm, Precision Machined
Main motor =7.5KW,Frequency speed control
Max line speed of roll former: Approx.15m/min
Protection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go Inside
D. Hydraulic Cutting Device
Stop to cut, Post cut, No Blanking cut
Cutting tool material : Cr12Mov, Heat treatment;
Hydraulic tank,Pump motor =4KW
E. PLC Control System
Control the quantity & cutting length automatically;
Combined with: PLC, Touch Screen (Siemens), Inverter (Schneider), Encoder (Omron), etc
Cut-to-length tolerance≤±2 mm
Control Voltage 24V
G. Product Rack Un-powered, 3 units
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
1.Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
2.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.