After-sales Service: | 1 Year Warranty |
---|---|
Warranty: | 1 Year Warranty |
Tile Type: | Colored Steel |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Gutter roll forming machine
USUAGE |
This gutter forming machine can produce various kinds of steel Gutters, which are playing an important roll for the drainage system of steel structured buildings. |
|
ADVANTAGE |
More reasonable forming process design and higher speed; Less roller steps with competitive price. |
|
COMPOSITION |
The whole line consists of un-coiler, feeding section,pre-shearing device, roll forming machine with protect guard, post-cut device, PLC control system, and so on. |
|
REQUEST |
Different kinds of panels can be offered to satisfy customers' different needs. Only if you provide the drawings wanted or the real objects of sectional materials, then we will be able to make the machine accordingly. |
We are here awaiting for your inquirys!
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free.
The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.