YX18-76.2-762 COLD ROLLING MILLS FOR ROOF
This Profile Drawing As Below Picture:
Profile:
Material:
0.4mm Minimum Thickness, 0.8mm Maximum Thickness
Effective width: 762±6mm
Feeding width: 940mm
Pre-paint Coil; Yield Strength: 550Mpa
General Parameter
1 |
Item |
Parameters |
2 |
Model NO. |
YX18-76.2-762 |
3 |
Material |
PPGI&Colored Steel |
4 |
Thickness |
0.4-0.8mm |
5 |
Yield Strength |
550 MPa |
6 |
Feed Width |
940 mm |
7 |
Effective width |
762±6mm |
8 |
Roll Stages |
20 Stages |
9 |
Shafts Diameter |
∅75 mm |
10 |
Main Motor Power |
5.5 kw |
11 |
Hydraulic Group Power |
4kw |
12 |
Max. Line Speed Of Roll Former |
Approx.15m/min |
13 |
Electric Standard |
According to local voltage |
Machine Components
A.5 Ton X 1250 Hydraulic Un-coiler
Hydraulic system expand coil inner hole, Pump motor: 3KW
Frequency Inverter to regulate turning speed, Motor: 3KW
Link-connect expanding system
Load capacity = Max.5Tons
Coil Inner-diameter=510±30 mm, Coil width = Max.1250mm
Automatic stopping device with limited switch as assistance to control stop/star rotation
B.Bending roller + manual pull-shear device
Manual pull-shear without power, only for the tail material cut off reminder function.
Working plate thickness:Max 0.8mm (note: useimpoved manual puller)
Manually pull the direction of the shears from the spocket wheel to the operation side.
C. Cold Rolling Mills
Feeding section with guide;
Gear/Sprocket driving;14-step to form
Rollers manufactured from 45 # steel, CNC lathes, hard Chrome Coated
Shafts Diameter=ф75mm, Precision Machined
Main motor =5.5 KW, Frequency speed control
Max line forming speed for roll former:15m/min
Protection Mesh Cover (full mesh type) Above Roll-former To Avoid Hands Go Inside
D.Hydraulic Cutting Device
Stop to cut, No Blanking cut
Pump motor =4KW
Cutting tool material: Cr12, Heat treatment
E. PLC Control System
Control the quantity & cutting length automatically.
Combined with: PLC, Touch Screen (Siemens), Inverter(Schneider), Encoder (Omron), etc
Cut-to-length tolerance≤±2.0 mm
Control voltage 24V
Product Rack Un-powered, 3 units
After-Sale Service
In correct operation & maintaining, the machine is guaranteed for one year since leaving our factory excludes the electric elements.
Installation:
If installation is needed, WE will dispatch a technician to the buyer's factory abroad to assist regulating the machine with charge free. The buyer should assist US to get the Chinese technician's visa and should pay for the roundtrip air ticket and the local accommodation.
If installation is needed, the buyer shall make the following preparation before arrival of technicians.
Terms Of Trade
1.Package & Shipment: Facility water-proof packing, Control cabinet packed in wooden packing.
2.Payment: 30%payment by T/T is required as deposit within a week since the contract signing date.70% payment by T/T is required before the machine be send out of factory.